Ragsdale Road Widening

🚧 Ragsdale Road Widening

Click a card below to view the location map or capital projects GIS map.

(PDF, 511KB)
📍
Ragsdale Road Location Map
PDF map showing the Ragsdale Road project location.
🗺️
Capital Projects GIS Map
Interactive map of all active capital improvement projects.

📋 Project Description

Ragsdale Road is a heavily traveled arterial road located in the southeast portion of Brentwood. Increasing traffic driven by developments within the city limits and from areas east and south of Brentwood is transforming this previously low-volume rural roadway into a more heavily used route. The current roadway design requires improvements to accommodate the increased traffic volume and ensure the safe passage of motorists.

This project involves widening Ragsdale Road between the intersection with Split Log Road and the Glen Ellen subdivision. The expanded roadway will consist of a 3-lane curb and gutter road with a center turn lane and intermittent raised median. A 10-foot bike/pedestrian path behind a 5-foot grass strip will be provided on the south side, with a 6-foot sidewalk on the opposite side.

Construction began October 2024
Bonus completion End of calendar year 2026
Final completion April 2027

📍 Location
Ragsdale Road from Split Log Road to North of Glenellen Way
👤 Project Contact
Sarah Katherine Totty, P.E.
City Engineer, Capital Projects
(615) 371-2290
Sarah.Totty@brentwoodtn.gov