Split Log Road Widening 3A
Split Log Road Widening 3A Location Map(PDF, 466KB)
Capital Projects GIS Map
Project Description
Split Log Road is an important arterial road that extends into unincorporated Williamson County within Brentwood’s Urban Growth Boundary. The current alignment, with vertical and horizontal curves that create sight distance and maneuvering challenges for motorists, requires realignment and widening to accommodate growing traffic demands and increased development interest in the area. This project phase will involve realigning and widening a 1.0-mile section of Split Log Road, extending from Sam Donald Road to the intersection at Sunset Road and Waller Road.
The improvements will include a 3-lane curb and gutter cross-section, with a 10-foot-wide multi-use path on the south/east side and a 6-foot sidewalk on the north/west side. This project offers the opportunity to extend the City’s bicycle/pedestrian path from its current terminus near the Cromwell subdivision all the way to the Sunset/Waller intersection. The project is expected to begin construction in 2027.
Location
Split Log Road from Sam Donald Road to the intersection of Sunset Road and Waller Road
Project Contact
Sarah Katherine Totty, P.E.
City Engineer, Capital Projects
(615) 371-2290
Sarah.Totty@brentwoodtn.gov
Project Documents
None at this time